Saturday 5 November 2011

Basic setup to Start work on Siebel Customization

1.Siebel Tools/Cleint Installed
2.Sisbel Sample Database Installed
3.CFG changes for the Sample/local/Server
4.ODBC Configuration for the Local and Server Database
3.Database Extract for the User
4.Intiilize the local Database for your Tools and Client(One would be fine)
5.Point the Tools and Client to the newly intilized Database.
6.Access the Tools and try to CheckOut a project on Server.
7.Project has been Checked out and ready for customization/Make Changes
8.Provide the Compilatin Settings under Tools
9.Provide the /Public folder path to store the scripts generated
10.Compile the Projects/Launch the thick Client to verify your changes.

No comments:

Post a Comment